TitleOn-farm Recharge Pilot Project Case Study - Karun Samran
Project Author(s) (Optional)
  • Sustainable Conservation
Year of Publication2023
Document Upload (Optional)karun-samran.pdf
Full Description

This Chowchilla-area grower tried on-farm recharge on his almond fields for the first time in 2023. This case study includes information on site conditions, water supply, soil health, on-farm recharge logistics, and recharge events.

Project Host Organization, Partner Organizations
  • Department of Water Resources
Topic Area(s)
  • Crop System Suitability
  • Infrastructure Conveyance and Hydraulics
  • Recharge and Extraction Methods and Measurement
  • Soils, Geology, and Aquifer Characterization
  • Water Quality

What is Flood-MAR?

Join Flood-MAR

What is the Flood-MAR Network?

Privacy Policy

Copyright 2022-Present, Flood-MAR and Contributing Authors.

Register or Login