| Title | Mattole River Headwaters Drought Relief & Flow Enhancement Project (Lunch-MAR | May 2026) |
|---|---|
| Resource Author(s) |
|
| YouTube Link | youtu.be |
| Date of Recording | May 6, 2026 |
| Full Description | Mattole River Headwaters Drought Relief & Flow Enhancement Project Presenter: Joel Monschke, Stillwater Sciences Sneak Peek: This project involves the construction and operations of two lined off-channel ponds with a combined storage capacity of 7.8 million gallons. The ponds are filled entirely during the wet season via direct precipitation and hillslope sheet-flow capture. Approximately 30 gpm of water will be released from the ponds via shallow groundwater flow during the dry season (typically July-October) to augment low summer stream flows that limit native Coho salmon and steelhead trout survival in Vanauken Creek, tributary to the Mattole River. The project was constructed in 2025 by Sanctuary Forest (project proponent) with funding provided by the CA Department of Water Resources. Lunch-MAR | May 6, 2026 |
![]() | |
| Topic Area(s) |
|
Copyright 2022-Present, Flood-MAR and Contributing Authors.